Direkt zum Inhalt

Importance of LIDAR measurement timing accuracy for wind turbine control

Zitieren

1.
Dunne F, Pao LY, Schlipf D, Scholbrock AK. Importance of LIDAR measurement timing accuracy for wind turbine control. In: American Control Conference. Portland, OR, USA; 2014. doi:10.1109/acc.2014.6859337.
Dunne, F. ., Pao, L. Y., Schlipf, D. ., & Scholbrock, A. K. (2014). Importance of LIDAR measurement timing accuracy for wind turbine control. In American Control Conference. Portland, OR, USA. http://doi.org/10.1109/acc.2014.6859337 (Original work published 2024)
Dunne, Fiona, Lucy Y. Pao, David Schlipf, und Andrew K. Scholbrock. (2024) 2014. „Importance of LIDAR Measurement Timing Accuracy for Wind Turbine Control“. In American Control Conference. Portland, OR, USA. doi:10.1109/acc.2014.6859337.
Dunne, Fiona u. a. „Importance of LIDAR Measurement Timing Accuracy for Wind Turbine Control“. American Control Conference. Portland, OR, USA: N.p., 2014.
Dunne, Fiona, u. a. „Importance of LIDAR Measurement Timing Accuracy for Wind Turbine Control“. 2024. American Control Conference, 2014.

Details

  • Date Published

    jun
  • Conference Location

    Portland, OR, USA