Test laboratory for sector coupling Power-to-Fuels and Chemicals

Key data
Project status
completed
Project duration
Project budget 702.769,00 Euro

Project description

The objective of this project is to set up and operate a pilot-scale plant which, by coupling hydrogen and biogas production, represents an integrated system for the efficient storage of temporally fluctuating renewable electricity production from wind and photovoltaics. 

In the test laboratory plant, the electrical energy is used to generate hydrogen (H2), which then reacts with the CO2 of the biogas produced in the biogas plant to form methane, which can be used either as a fuel or as a starting material for chemical synthesis. With the plant we test and further develop the dynamic operation with a fluctuating supply of hydrogen on the one hand and the production of biogas from residual materials coupled with the conversion of fermentation residue into valuable fertilizer on the other hand.  By coupling these processes, we test and optimize an efficient system of energy storage with simultaneous value creation from biomass under real conditions.

Zwei Männer halten ein Plakat auf dem die Farben weiß, lila und rot dominieren an eine Backsteinwand. Sie stehen links und rechts vom Plakat, noch weiter links steht eine Frau. Alle drei lachen.
Nun ist es offiziell: im G-Gebäude wird in den kommenden 2 Jahren das Testlabor Sektorkopplung eingerichtet. Wiktoria Vith, Hinrich Uellendahl und Thies Langmaack freuen sich über den Startschuss.

Funding

Europäische Union [EFRE-Mittel]