Project status
completed
Project duration
Overall project budget
11.250,00 Euro

Project description

The cooperation project between FUAS and Stadtwerke Flensburg is to deal with the operational management of the generation plant in a local heating supply system in a new residential area which, as a subsystem of the Flensburg district heating network, is mainly supplied by large heat pumps. The project objective of FUAS' contribution is to determine the economically optimised use of different system configurations in the various expansion stages of the supply network. (operation of a local heating supply with heat pumps)

Funding

Stadtwerke Flensburg
Gesellschaft für Energie und Klimaschutz Schleswig-Holstein GmbH, EKSH