Skip to main content

Projekt Optimus 295 20 MW - Project presentation on the world's largest and most powerful wind turbine to date

Eine große Gruppe von Menschen verschiedenen Alters steht auf einer Treppe vor einem Gebäude versammelt und lächelt in die Kamera.
Key data
starts
ends
audimax, Gebäude Hörsaalzentrum

In the Optimus 295 20 MW project, students are working on a concept study for the world's largest and most powerful offshore wind turbine at 20 MW. The turbine is being developed for a site in Turkey in the Aegean Sea in collaboration with the Izmir Institute of Technology.
The students' results will be presented in the Audimax on 6 February 2024 from 10-11:30 a.m. This will be followed by a get-together in the foyer, where there will be some snacks and drinks. 
There is also the possibility to participate online.

We look forward to seeing you there!


To register for the event, please send an email to carlotta.richter@hs-flensburg.de and let us know whether you would like to participate in person or online.